Do I Need a Building Permit?
Do I need a Building Permit?
Before applying for a building permit, applicants should check with the Land Use Administrator to determine if any land use permits are required for a proposed project.
Building Permits are Required for:
NEW SINGLE-FAMILY RESIDENCE OR DUPLEX | All new single-family residence, townhouse or duplex unit. |
SINGLE-FAMILY RESIDENCE OR DUPLEX ADDITION/REMODEL | An addition or remodel of an existing single-family residence, townhouse or duplex unit (includes changing means of egress or structural work, excludes finish work and dry walling). |
NEW ATTACHED GARAGE | All new attached garages. |
DETACHED ACCESSORY | Any structure more than 200 square feet in size that is not considered a part of the "principal" structure. |
NEW MULTI-FAMILY UNIT | All new multi-family (4 or more units) need to be designed by a licensed Colorado design professional. |
MULTI-FAMILY UNIT ADDITION/REMODEL | An addition or remodel of an existing multi-family (4 or more units) needs to be designed by a licensed Colorado design professional. |
NEW ACCESSORY DWELLING UNIT (ADU) | All accessory dwelling units (ADUs) located on the same property as a principal dwelling unit. |
NEW COMMERCIAL/LODGING STRUCTURES | All new commercial structures need to be designed by a licensed Colorado professional. |
COMMERCIAL/LODGING ADDITION/REMODEL | An addition or remodel of an existing commercial building needs to be designed by a licensed Colorado professional. |
TENANT FINISH | New tenant interior remodel. |
DECK | Any covered deck or deck that is more than 30" above grade. |
ELECTRICAL | All electrical work as determined and permitted by the State of Colorado Electrical Board including but not limited to: temporary construction service, the wiring of a structure, fire alarm installation, and photovoltaic installation. |
GAS LINE | New gas lines or the repair of gas lines require a gas line permit and an inspection completed by the Public Works Department verifying that the line holds pressure. |
MECHANICAL | The addition, replacement, or repair of mechanical systems requires a mechanical permit. |
PLUMBING | The addition, replacement, or repair of water or sewage systems, water service lines, drains, water mains, sewage disposal systems requires a plumbing permit. |
SOLAR | All solar panel installations require a building permit. |
MOBILE HOME INSTALLATION | Set up of mobile homes requires a Mobile Home Permit. Please provide the trailer year, make, model, width, length, and VIN. |
TINY HOME SETUP | Set up of tiny homes requires a Tiny Home Permit. Please provide a 3rd Party Inspection report. |
DEMOLITION | A State of Colorado Demolition Permit is required for any structural demolition. Proof of an approved State of Colorado permit is required prior to the issuance of a Town of Bayfield demolition permit. |